New Offices at Holborn

10/09/2016 Published By ICL-CMS

The Cat B fit out to the new offices in Holborn included a new reception and waiting area, client meeting rooms, dictation rooms, and open plan offices.

Manufactured and installed single and double doors and frames; finished with Polyrey Aubergine to both sides and glazed vision panels with frosted vinyl film manifestation; completed with brushed SS ironmongery.

A gloss integrated handle kitchen was installed into the main staff area which included wall and floor mounted cabinets, Corian worktop and painted sandblasted splash-back with cut-outs for the electrical services and a painted sandblasted shelf with concealed lighting. A smaller kitchenette was also introduced within the office break-out area consisting of floor and wall mounted cabinets.

This contract was completed with careful management and organization with the Building Management regarding deliveries and noise for the sitting tenants; to minimise disruption to their day to day businesses.

5q0a5337-edit

5q0a5287-edit  FD6  5q0a5354-edit

Share this page: